Current out of hours works

View current out of hours works approved by Council

The following works are scheduled to take place outside of approved construction hours.

Council only approves work outside approved construction hours in specific circumstances. Examples include overnight shop fit-outs or where demolition, excavation or erection of structures may be a risk to public safety during daylight hours.

Approved hours of work

The approved hours of work for a specific development site are contained in the Development Consent.

You can view the Development Consent for each site via our application tracker.

Application tracker

Please note, we are not the only authority who can approve out of hours works. There may be additional approved works we are not aware of (for emergencies, water works etc).

Navigating this page

View current works by clicking next below or clicking the links in the box at the top of the page.

Works by other authorities

Third parties, such as utility companies and state departments, do not have to notify Council of emergency works.

For more details on out of hours works being carried out in your area, check with the following organisations:

155 Miller Street, North Sydney (Intersection Berry and Miller Streets)

Works: Pavement restoration 

Work dates:   

  • Tuesday 24 February, 7.00pm to 5.00am
  • Wednesday 25 February, 7.00pm to 5.00am
  • Thursday 26 February, 7.00pm to 5.00am

Weather permitting.

Contact: Philip Stylianou, 0413046545, philip.stylianou@lendlease.com

 

52-56 Atchison Street, St Leonards

Works: Water connection works 

Work dates: Wednesday 11 February, 9.00pm to 2.00am, weather permitting. 

Contact: Adrian Carrick, 0484342156

138 Walker Street

Works: Investigation of existing pit and conduits 

Work dates: Works will take place on Wednesday 18 February between 8pm to 6am, weather permitting.

Contact: Liz Macmillan,  liz.macmillan@acciona.com,  0412511636

250 Pacific Hwy, Crows Nest

Works: Footpath/road occupancy 

Work dates: Wednesday 25 February, 9.00am to 5.00am, weather permitting. 

Contact: Phillip Blaire, Rhino Traffic Control ops@rhinotrafficcontrol.com.au 

Denison Street, North Sydney

Works: Stormwater drainage pits rectification 

Work dates:

Wednesday 25 February, 2026, 7.00pm to 5.00am

Contact: philip.stylianou@lendlease.com

Levick St, Cremorne

Works: Kerb and gutter/footpath

Working hours: Monday 23 February, 2026, Monday-Friday, 7am-5pm, Saturday, 8am-2pm.

Weather permitting.

Contact: Council’s Engineering Project Manager, Ashraf Doureihi, on 0421 020 129 or 
ashraf.doureihi@northsydney.nsw.gov.au 